Contract: Carrick Castle Replacement of Bridge.
Client: Argyle & Bute Council
Description: Demolition of existing structure and replace with box culvert units. A temporary diversion route was established with a temporary bridge designed to carry traffic during the works. Masonry for the structure was dismantled from the existing bridge and used to rebuild the new parapets and wing walls.