Perth and Kinross – Kenmore landslip
Duration – 16 weeks
June 2014
Kenmore landslip was a partial collapse of the carriageway built on top of a 16m high embankment, the works involved cutting, benching, installation of 10000 tons of structural fill and regrading to new the existing slope.
Carriageway drainage and surfacing works.
500m cubed of gabion wall works and gabion cascade all installed by our own staff.